Distribution Centre Warehouse & Cool Room Fit-Out -

  • Home
  • Distribution Centre Warehouse & Cool Room Fit-Out
Toll Kemps Creek Distribution Centre Warehouse & Cool Room Fit-Out
  • June 10, 2026
  • Luciana Alves

Toll Kemps Creek Distribution Centre Warehouse & Cool Room Fit-Out

Keece Electrical Services NSW successfully delivered the electrical installation package for the Toll Kemps Creek Distribution Centre, completing a comprehensive warehouse and cool room fit-out over a five-month construction program for Toll Group through Mainbrace.

yellow arrowThe project was undertaken within a massive 66,000-square-metre distribution facility and required extensive coordination between multiple trades, strict staging requirements and careful planning to maintain progress throughout construction.

yellow arrowDelivered five weeks ahead of schedule, the project included major power infrastructure, warehouse services, temperature-controlled cool room installations, office fit-out works and specialised operational facilities.

Project Overview

Client: Toll Group
Builder: Mainbrace
Location: Kemps Creek, NSW
Project Duration: 5 Months
Project Manager: Jason Kennedy
Site Supervisor: Daniel Cipri
Leading Hand: Luke Coughtrey
Apprentices: Chadi Kourouche, Jade Ross, Zak Williams, Ken Zhang

Toll Kemps Creek Distribution Centre

Warehouse Power Infrastructure

A key component of the project involved the installation of more than 600 metres of NEMA 2 cable tray throughout a 500-metre-long warehouse facility.

Despite site restrictions, the installation team was limited to a maximum of 50 metres of tray installation per day. Through detailed planning and coordination, the entire cable tray network was successfully completed within two weeks, supporting the extensive electrical distribution requirements across the facility.

yellow arrowKeece also completed the installation of a new Main Distribution Board (MDB) and three NHP distribution boards featuring dedicated lighting and power chassis to service the warehouse and office areas.

Major Mains Cabling Installation

Furthermore, working alongside National Cable Installations, Keece completed an extensive 11.5-kilometre aluminium XLPE mains cabling installation over nine night shifts.

The installation consisted of:

  • 2 x 240mm² aluminium XLPE cable sets supplying the new Main Distribution Board (MDB)
  • 2 x 400mm² aluminium XLPE cable sets supplying the Mechanical Main Switchboard (MSSB)
  • Two parallel mains systems providing reliable power distribution across the facility

This critical infrastructure supplied power to two large temperature-controlled cool rooms, each measuring approximately 80 metres by 20 metres.

Office Fit-Out & Lighting Controls

Meanwhile, a new office area was constructed at the rear of the warehouse to support operational and administrative staff.

Keece delivered:

  • General power installations
  • Office lighting systems
  • Meeting room electrical services
  • Break room power and lighting infrastructure

All new lighting installations were successfully integrated into the facility’s existing Dynalite lighting control system, ensuring consistent operation and energy-efficient management throughout the site.

Operational & Specialist Facility Works

In addition to the primary fit-out works, Keece completed several specialised installations directly for Toll Group, including:

  • Installation of 16 forklift battery chargers
  • Removal and relocation of 3 Big Ass Fans
  • Additional power dropper installations and modifications
  • Electrical services for a dedicated dangerous goods storage cage designed for flammable materials

These works enhanced operational efficiency while supporting the facility’s safety and compliance requirements.

Apprentice Development & Team Performance

In addition to the primary fit-out works, Keece completed several specialised installations directly for Toll Group, including:

  • Installation of 16 forklift battery chargers
  • Removal and relocation of 3 Big Ass Fans
  • Additional power dropper installations and modifications
  • Electrical services for a dedicated dangerous goods storage cage designed for flammable materials

These works enhanced operational efficiency while supporting the facility’s safety and compliance requirements.

Delivered Ahead of Schedule

Through strong project management, effective trade coordination and a commitment to quality workmanship, Keece successfully completed all electrical works, energisation and commissioning activities within the five-month construction program.

The entire project was handed over five weeks ahead of schedule, providing Toll Group with a fully operational warehouse, cool room and office facility ready to support ongoing distribution operations.

Why Keece

From major distribution centres and logistics facilities to specialised industrial environments, Keece delivers complete electrical solutions that support operational performance, reliability and long-term growth. With extensive experience across warehouse developments, industrial infrastructure and large-scale commercial projects, our teams continue to deliver safe, high-quality outcomes across Australia and New Zealand.

Building Future Careers Through Trade & Tech Fit

Recent Posts

  • Distribution Centre Warehouse & Cool Room Fit-Out
  • Building Future Careers Through Trade & Tech Fit
  • EV CHARGING INFRASTRUCTURE COMPLETE AT NHP
  • Keece Expands Sustainable Fleet with New Plug-In Hybrid Vehicles
  • Rapid Response Electrical Maintenance Services | Keece

Filter our blog

Our Locations

Keece Head Office VIC
121 Burnley St, Richmond. VIC, 3121

NSW: Unit 2, 2-6 Waltham St, Artarmon. NSW, 2064

QLD: Unit 5, 186 Douglas St, Oxley. QLD, 4075

SA: Unit1A, 32 Queen St, Thebarton Adelaide. SA, 5031

NZ: 78B Porana Road, Hillcrest, Auckland. NZ 0627

Keece Links

  • Home
  • Services
  • Projects
  • About Us
  • Careers
  • Blog
  • Contact

Contact Us

AU: 1300 537 537

NZ: 09 884 9780

Send an eMail

service@keece.com.au

service@keece.co.nz

© 2026 Keece Group Pty Ltd

  • Keece Privacy and Governance Policies
dustra